Skip to content

Sources

Asana ​

For agencies that run their projects in Asana, connecting it brings your task names, descriptions, and project details into memory — where Ask can search them.

Connect it ​

Sources → Asana → Connect. You'll authorise with your Asana account; Asana's consent screen shows what access Vythos is requesting. Back in Vythos, press Sync to pull in your tasks.

What gets synced ​

Vythos reads a sample of your project tasks. The sync takes up to 3 workspaces, up to 5 projects in each, and up to 50 tasks in each project. For each task you get:

  • Task name and description
  • Project and workspace the task belongs to
  • Assignee and due date
  • Open or completed status
  • Tags applied to the task
  • Link back to the task in Asana

Comments, subtasks, and attachments are not included in the sync.

The text goes into your memory. Nothing becomes a rule by being synced. Asana tasks cannot be used as rules today.

Syncing again ​

Automatically, about every hour. You can also sync by hand from the Sources page. Re-syncing replaces what changed rather than duplicating it.

Because of the limits above, expect what comes in to be a sample of your project work rather than your full Asana history. It may not include your newest tasks.

Disconnecting ​

Disconnecting Asana removes its access. Vythos asks whether to remove what it already put in your memory, with the count, ticked: leave it ticked to erase it, along with the record of what was synced; untick to keep it.

Troubleshooting ​

ProblemFix
Tasks from a project aren't appearingThe sync takes a limited number of workspaces, projects, and tasks. The project may not have been included in this round
Asana stops syncingReconnect Asana in Sources and sync again

Vythos — the context layer for agencies that run on their own rules.